Power Cable Installation Projects (66kV)
We have successfully completed multiple high-capacity 66kV underground power cable installation projects across Singapore, delivering reliable electrical infrastructure with precision and safety.
- ST James Substation → Sentosa Substation
- Cable Length: 1800 meters
- Main Contractor: New Castle Engineering
- Jurong Pier Substation → New Mobil Substation
- Cable Length: 1980 meters
- Main Contractor: New Castle Engineering
- Toa Payoh Substation → New Bishan Substation
- Main Contractor: New Castle Engineering
Fire Hydrant System Projects
We have delivered critical fire protection infrastructure projects, ensuring safety compliance and efficient water distribution systems.
- Paya Lebar Airbase
- Scope: Supply & Installation of 150mm Dia Fire Hydrant Pipes
- Main Contractor: Zemag Engineering
- Sungei Tengah Airbase
- Scope: Supply & Installation of 150mm Dia Fire Hydrant Pipes
- Main Contractor: Zemag Engineering
- Makino Facility
- Scope: Installation of 150mm Dia Fire Hydrant Pipes
- Main Contractor: A-One Maintenance
Excavation & Infrastructure Works
Our expertise also extends to large-scale excavation and trenching works for infrastructure and fire safety systems.
- Singapore Polytechnic
- Scope: Excavation for Fire Hydrant Pipe Laying
- Main Contractor: TGG
- Collins Aerospace, Bedok
- Scope: Excavation for Fire Hydrant Pipe Laying
- Main Contractor: HART Engineering
Our Expertise Across Completed Projects
- 66kV Underground Cable Installation
- Horizontal Directional Drilling (HDD)
- Fire Hydrant Pipeline Systems
- Excavation & Trenching Works
- Industrial & Infrastructure Development