Power Cable Installation Projects (66kV)

Power Cable Installation Projects (66kV)

We have successfully completed multiple high-capacity 66kV underground power cable installation projects across Singapore, delivering reliable electrical infrastructure with precision and safety.

  • ST James Substation → Sentosa Substation
    • Cable Length: 1800 meters
    • Main Contractor: New Castle Engineering
  • Jurong Pier Substation → New Mobil Substation
    • Cable Length: 1980 meters
    • Main Contractor: New Castle Engineering
  • Toa Payoh Substation → New Bishan Substation
    • Main Contractor: New Castle Engineering

Fire Hydrant System Projects

We have delivered critical fire protection infrastructure projects, ensuring safety compliance and efficient water distribution systems.

  • Paya Lebar Airbase
    • Scope: Supply & Installation of 150mm Dia Fire Hydrant Pipes
    • Main Contractor: Zemag Engineering
  • Sungei Tengah Airbase
    • Scope: Supply & Installation of 150mm Dia Fire Hydrant Pipes
    • Main Contractor: Zemag Engineering
  • Makino Facility
    • Scope: Installation of 150mm Dia Fire Hydrant Pipes
    • Main Contractor: A-One Maintenance

Excavation & Infrastructure Works

Our expertise also extends to large-scale excavation and trenching works for infrastructure and fire safety systems.

  • Singapore Polytechnic
    • Scope: Excavation for Fire Hydrant Pipe Laying
    • Main Contractor: TGG
  • Collins Aerospace, Bedok
    • Scope: Excavation for Fire Hydrant Pipe Laying
    • Main Contractor: HART Engineering

Our Expertise Across Completed Projects

  • 66kV Underground Cable Installation
  • Horizontal Directional Drilling (HDD)
  • Fire Hydrant Pipeline Systems
  • Excavation & Trenching Works
  • Industrial & Infrastructure Development